Skip to content

DESIGN-BUILD

State Route 91 Improvement

This corridor improvement Design-Build project focused on existing 14-miles of congestion. The scope of work focused on a 6-mile segment extending from the SR-241 toll road to SR-91, incorporating major upgrades to the I-15 Freeway Corridor. The primary objective was to alleviate persistent daily traffic congestion and improve overall traffic flow and mobility throughout the region.

Group Delta, an NV5 Company, developed post advanced planning study, provided geotechnical data reports for bridges and performed daily review of design-build contractors submittals. Our team also provided quality assurance materials testing and special inspection for multiple parcels within expanding Caltrans right of way.

Added Value

  • Geotechnical Expertise: Our team delivered geotechnical data reports for bridge structures and supported post-advanced planning efforts, ensuring sound design foundations.
  • Design-Build Integration: Our team provided daily review of contractor submittals, helping maintain quality and compliance throughout the fast-paced Design-Build process.
  • Quality Assurance & Inspection: Our team conducted materials testing and special inspections across multiple parcels within the expanding Caltrans right-of-way, ensuring construction met rigorous standards.

Location:
Riverside County, California

Client:
Orange County Transportation Authority
California Department of Transportation
Riverside County Transportation Commission

Project Owner:
Orange County Transportation Authority
California Department of Transportation
Riverside County Transportation Commission

Service:
Geotechnical Engineering
Materials Testing & Special Inspection

Market:
Design-Build

Project Size: 14 miles
Project Cost: $1.4 billion

RELATED PROJECTS
Back To Top
Search