Skip to content

Airports

Credit: Delta Airlines, Inc.

Delta Airlines T2/T3 Modernization Program

Group Delta, an NV5 Company, has provided and is currently providing consulting and construction observation work for this modernization project where Delta Airlines is embarking on a multi-year terminal construction and modernization project at LAX. The redevelopment includes Terminals 2 and 3, and construction of a connector from Terminal 3 to Tom Bradley International Terminal.

Our team provided the field investigation to assess pavement subgrade conditions at the T2 and T3 aprons; pile load test observation, analyses, and reporting for torque down pipe piles for enabling works; communicating with City of Los Angeles Grading Department; Geotechnical construction observation for pile installation and utility relocation backfill; and hazardous materials sampling and testing.

Our team also managed the work of subconsultants, including subsurface utility surveys; topographical and surface utility surveys; non-destructive pavement testing; and survey scanning and BIM modeling of existing facilities.

Value Added

  • Integrated Survey & Testing Services: Our team provided materials testing and inspection services, including pavement core sampling and testing to support terminal redevelopment.
  • Advanced Infrastructure Mapping: Our team conducted topographical and utility surveys tied to the LAX Horizontal and Vertical Control Network for accurate infrastructure integration.
  • Stormwater System Assessment: Our team performed CCTV surveys of all accessible storm drain lines to support drainage planning and environmental compliance.

Location:
Los Angeles, California

Client:
Delta Airlines, Inc.

Project Owner:
Delta Airlines, Inc.

Service:
Testing & Inspection Services

Market:
Airport

Project Size: 1,200,000 Sq ft
Project Cost: $1.9 Billion

RELATED PROJECTS
Back To Top
Search