SDSU Fenton Parkway Bridge
The project includes constructing a new bridge to connect Fenton Parkway with Camino Del Rio North. The phase of the project includes providing a geotechnical investigation for the bridge, providing subsurface explorations near the locations of the proposed abutments of the approximately 450-foot-long bridge.
Added Value
- Targeted Geotechnical Investigation for Bridge Design: Our team conducted subsurface explorations near the proposed abutment locations of the approximately 450-foot-long bridge, providing critical data to support safe and efficient structural design.
- Site-Specific Engineering Analyses: Our team delivered geotechnical recommendations tailored to the unique subsurface conditions of the project area, helping mitigate risks related to settlement, slope stability, and foundation performance.
- Support for Infrastructure Expansion: Our team enabled informed design and construction planning for a key transportation link, contributing to improved connectivity and mobility in the surrounding urban area.
Location:
San Diego, California
Client:
San Diego State University
Project Owner:
San Diego State University
Service:
Geotechnical Engineering
Market:
Bridges & Highways
Project Size: 450 Ft Long
Project Cost: $53 Million
RELATED PROJECTS



